国产毛片免费观看网站,中文字幕国产亚洲最新一,欧洲aⅴ亚洲av综合在线观看,看大片免费完整版亚洲大片

Today:
首頁 > English > News Gallery > Company Everts > Company News

MBEC Wins the 2nd Stage of Northland Viaduct Project

Source:    Date:2013-11-12  

Recently, MBEC won the 2nd Stage of Northland Viaduct Project, the accepted Contract Amount is 173680585.00 yuan and the construction period from September 21st, 2013 to October 31st, 2014. The Shenyang Engineering Company will be responsible for the construction works.

The project locating in Central Business District of Benxi City includes the main bridge in a single-pylon cable-stayed bridge form and the approach adopting RC Cast-in-situ box girder and PC Cast-in-situ box girder. The detailed span arrangement is (32.5+40+30.76) m+ (152+48+42) m+13m, of which the (152+48+42) m constitutes the main bridge. The main beam is in a combined form of steel beam and PC Beam.

up:

next: